Material
Steel Grade | Chemical Composition % | |||||||
C | Si | Mn | Cr | Ni | Mo | S | P | |
ZG25CrNiMo | 0.25-0.30 | 0.20-0.40 | 0.70-0.90 | 0.40-0.70 | 0.40-0.70 | 0.15-0.25 | ≦0.025 | ≦0.025 |
ZG30CrMo | 0.26-0.33 | 0.17-0.37 | 0.40-0.70 | 0.80-1.10 | — | 0.15-0.25 | ≦0.025 | ≦0.025 |
ZG35CrMo | 0.32-0.40 | 0.17-0.37 | 0.40-0.70 | 0.80-1.10 | — | 0.15-0.25 | ≦0.025 | ≦0.025 |
Standard | Yield Strength Rp0.2 /MPa | Tensile Strength Rb / MPa | Elogation A / % | Reduction of Area Z/ % |
60K | ≥414 | ≥586 | ≥18 | ≥35 |
75K | ≥517 | ≥655 | ≥18 | ≥35 |
80K | 585-660 | ≥725 | ≥18 | ≥35 |
Normally we will follow 75K standard.
Prodution process
No. | Equipment Name | Quantity(Set) |
1 | Transformer substation | 1 |
2 | Full set of wooden molding equipment | 10 |
3 | Sodium silicate sand mix line | 4 |
4 | Alkaline phenol resin sand mix line | 2 |
5 | 25 tons Electric arc furnace | 1 |
6 | 50 tons Intermediate frequency furnace | 2 |
7 | 120 tons Refining furnace | 1 |
8 | 120 tons VD furnace | 2 |
9 | 12m*9m*6m Heat treatment furnace | 3 |
10 | 120 tons Large-scale shot blasting machine | 1 |
11 | 150 tons Travelling crane | 2 |
12 | 125 tons Travelling crane | 3 |
13 | 200 tons Travelling crane | 2 |
14 | CNC gantry boring and milling machine | 2 |
15 | 2.5m-10m Digital vertical lathe | 16 |
16 | Boring and milling machine | 13 |
17 | Horizontal lathe | 3 |
18 | Large dust removal equipment | 7 |
1)The engineer will firstly prepare the technology and do a simulation before pouring.
Our factory is established in 2003,the chief engineer is the second genaeration.
Their experience is rich.
2)We will make a pattern of the kiln tyre based on engineer's technology.
It will cost us around one week.
After that the engineer will check the dimension and make a record.
A good pattern making is necessary.
3)Sand molding making will be made by experienced wokrers.
Their salary is decided by the quality and most of them have more than 10 years' experience.
In our mind,they are not only workers,but also can be called technicians or artists.
4)Pouring and cooling.
There are one 8tons electrical arc furnace;
Two 50 tons medium frequency furnace;
One 120 tons refining furnace and one 120 tons VD furnace;
Cooling time will be around 72hours,96hours or 120 hours.
It is up to the weight of the castings.
5)Clean the sand and cut the riser after normalizing
6)Heat treatment will cost 7days( 4 days normalizing and 3 days tempring).
There are 8 heat treatment furances with max. one is 12m*9m*6m.
7)dimension check and draw a line for machining.
Before we do the rough machining,we should firstly check the dimension to see whether there is enough allowance.
8)Rough machining
9)NDT withe qualified inspector
10)Welding repair if needed and tempering for stress relief.
The welders have neccesary welding certificate.
11)Final machining and NDT
12)Customers' inspection and packing
About Haitai
Haian Haitai Casting Co.,Ltd. is established in 2003.
We supply large steel castings with low carbon or alloy steel from 3 tons to 150 tons per piece.
With a quick development,now we had supplied steel castings 6,000 tons per month.
There are three workshop for sand mold making,one workshop for machining and one for post procedure.
We have rich experience to supply castings for BOP of Russian market.
Every month we supply 1000 tons petroleum machinery casting parts for Hebei Province Renqiu City,Shanghai Shenkai Group,Yanchen city and some Russian customers.
Testing Equipment
No. | Equipment Name | Quantity(Set) |
1 | Sand analysis equipment | 1 |
2 | Impact sample low temperature meter | 1 |
3 | Direct reading spectrometer(OXFORD) | 2 |
4 | ONH analyzer | 1 |
5 | ZEISS metallurgical microscope | 1 |
6 | Pendulum impact tester | 1 |
7 | Microcomputer controlled electro-hydraulic servo universal test machine | 5 |
8 | Various hardness tester | 4 |
9 | Magnetic defect detector | 5 |
10 | Ultrasonic flaw detector(digital) | 1 |
11 | CX-52 Total station | 1 |
12 | Stylus roughness meter | 1 |
We do the test according to diffrent production step,
such as chemical composition,UT,MT and mechanical property.
In 2021,Haitai inspection and testing center got approval from CNAS.
Delivery
Our company is near to Shanghai port and we can supply different packing according to customers' specification.